BASE DE PARED

Option 1 – Poured concrete

A poured concrete foundation / stem wall is the most commonly used and is used in almost all the various building applications.

This option typically requires a Shop Drawing enabling the concrete subcontractor to properly place the vertical rebar.

Option 1A – Standard CMU with Omni Block top course

Standard CMU is used above the footing for all courses except for the top course where Omni Block is used. After Omni Block is laid it is then insulated in all the exterior cells with the Long Insert while the rest of the wall is solid grouted.

There are numerous advantages to the block stem option pictured below:

The photo at left shows Omni Brick being used in the stem wall. The exterior cells are insulated and the rest of the block will be solid grouted. Photo was taken before any electrical or plumbing embeds were installed.